BAS 103310
Mühldamm pedestrian bridge

05.12.2022
© www.brueckenweb.de / Frank Sellke

05.12.2022
© www.brueckenweb.de / Frank Sellke

05.12.2022
© www.brueckenweb.de / Frank Sellke
Germany
Bavaria
Coburg
Itz
pedestrian
Truss bridge
Steel
2021
23.00 m
23.00 m
0.00 m
0.00 m
0.00 m
0.00 m2
in operation
Wikipedia: The pedestrian bridge was built in June 2021 as part of the redevelopment of Sonntagsanger to connect it to the mill dam. The trough bridge structure features steel truss girders on both sides. The bridge is 23 meters long and weighs 18 tons. The developer of the Sonntagsanger quarter donated the bridge to the city.
A map is loading