Information provided by Pavel Walsh:<br><br>Width: 40.00-50.00 m<br>A part of the bridge was put into operation in 1983. She is now hopelessly congested, inappropriate and dangerous main link of the motorways D1 and D5 by Prague. It has two distinct roads with four traffic lanes. Six fields with the spans of 34.00-61.00-71.00-72.00-66.00-45.00 m. The bridge is the largest bridge construction work in the Czech Republic. It was originally planned as a temporary measure for five years. A large, 'balance' is called on the bridge, refer to concrete sculpture by J. KLIMEŠ, Prague as "Hippo pool".