BAS 110200
Chilsandaegyo 칠산대교
Keine weiteren Bilder verfügbar
South Korea
Jeollanam-do (전라남도)
Chilsan
sea
Street
Cable-stayed bridge
2012-2019
320.00 m
1820.00 m
0.00 m
0.00 m
0.00 m
0.00 m2
in operation
In 2016, an accident occurred during construction in which the superstructure (cantilever construction) tipped over and collapsed.
A map is loading