The Deutzer bridge has received a twin from 1976 to 1980. In contrast to the design of the existing steel hollow box bridge is the extension as a hollow box bridge in tensioning concrete construction.<br><br>The Gemini was built South of the existing bridge (i.e. upstream) and pushed to completion in a several-day action at the existing bridge.<br><br>Some data:<br><br>four-lane road bridge, separate section of double track rail tracks for Stadtbagn; both sides walking and cycling routes<br><br>Spans:

132-185 Meters - 120 metres, a total of 437 meters<br><br>Width:

originally 20,61 meters, after enlargement 31,50 m