BAS 2931
Taennichtbachtalbruecke
Keine weiteren Bilder verfügbar
Germany
Saxony
Nossen
Motorway A4
Girder bridge
Prestressed concrete
Oktober 1996 - Juni 1999
40.00 m
190.00 m
45.00 m
19.30 m
0.00 m
0.00 m2
in operation
The bridge consists of 2 separate buildings of different width. Superstructure on the South there are two additional lanes for the junction of the A14 from Leipzig transport in the direction of Dresden, so is r'hir a width of 26.25 m e