brueckenweb-logo
discover
Icon
bridges
Icon
bridge search
Icon
nearby
Icon
most bridges records
Icon
disasters
Icon
country overview
Icon
collections
Icon
articles
Icon
bridge news
Icon
literature
Icon
store
Icon
Icon
pinboard
Icon
Icon
clubinfo
join in
only for registered club members
administrate
only for registered club members

    1999 - 2026 © Frank Sellke / brueckenweb.de

    Icons by Icons8.com

    Version 5.1.16

    Legal Notice | Privacy Policy | ⚠️ Vertrag widerrufen

    BAS 3007
    Trebelbruecke
    Brückenbild

    2004

    © Wolfgang Fredrich

    verboten / prohibitedNo other use permitted
    Bild 1

    2004

    © Wolfgang Fredrich

    verboten / prohibitedNo other use permitted
    Bild 2

    22.10.2007

    © Frank Sellke / brueckenweb.de

    gegen Entgeld / for a feeUse in accordance with the terms and conditions
    To Bridge Images
    Germany
    Mecklenburg-Western Pomerania
    Nehringen (Kreis Nordvorpommern)
    Trebel
    Street
    Movable bridge, drawbridge
    Wood
    1900 erneuert 1947 und nochmal 1983 bis 1991
    7.00 m
    44.50 m
    7.00 m

    A map is loading

    Timeline

    Loading timeline...

    Tags

    Loading tags ...

    Editing is available for members (midgr >= 6).

    News

    Lade Nachrichten ... loading news ...

    Links

    Loading links ...

    Literature

    Loading literature ...

    Collectibles

    Loading collectibles ...

    Videos

    Loading videos ...

    Documents

    Loading documents ...

    2.30 m
    0.00 m
    267.00 m2
    in operation
    Information provided by Henrik Halim:<br>Width between the railings: 6.0 m<br>Road width: 3.5 m<br><br>The bridge was reconstructed completely 1983 and 1991, i.e. the old bridge was cut completely (including the
 Foundation) and newly built along historical lines. The bridge connects the regions of Mecklenburg and Western Pomerania (historical country border is the Trebel)
 The shutter function is no longer used because no professional shipping more happens on the Trebel.<br><br>The bridge is being repaired (construction period September - October 2004).<br>The following steps are performed:
 -Partial renewal Taira<br>-complete renewal of the abutment, arrangement of towing plates<br>-complete renovation of the bridge railing (replace the Nadelholzes by oak)<br>-Replacing individual damaged wooden parts<br>-Repairing of winches<br>-Renewal of corrosion protection of the steel fittings<br>-Renewal of wood paint<br>