brueckenweb-logo
discover
Icon
bridges
Icon
bridge search
Icon
nearby
Icon
most bridges records
Icon
disasters
Icon
country overview
Icon
collections
Icon
articles
Icon
bridge news
Icon
literature
Icon
store
Icon
Icon
pinboard
Icon
Icon
clubinfo
join in
only for registered club members
administrate
only for registered club members

    1999 - 2026 © Frank Sellke / brueckenweb.de

    Icons by Icons8.com

    Version 5.1.16

    Legal Notice | Privacy Policy | ⚠️ Vertrag widerrufen

    BAS 361
    Sinn Valley bridge
    Brückenbild

    09.09.2018

    © www.brueckenweb.de / Frank Sellke

    gegen Entgeld / for a feeUse in accordance with the terms and conditions
    Bild 1

    09.09.2018

    © www.brueckenweb.de / Frank Sellke

    gegen Entgeld / for a feeUse in accordance with the terms and conditions
    To Bridge Images
    Germany
    Bavaria
    Bad Brückenau
    Sinntal
    Motorway A7
    Girder bridge
    Composite steel
    2009 bis 2013
    107.00 m
    755.00 m
    29.50 m
    0.00 m
    0.00 m
    0.00 m2
    in operation
    WIKIPEDIA: Due to the repeatedly occurring weld cracks due to metal fatigue the old bridge had to be replaced after 40 years by a new. Southwest, since May 2009, this is next to the old bridge in a distance of 46 m. Until the completion of the new bridge in the year 2012, subject to authorisation schwertransporte may no longer cross the building. Also, a ban on overtaking, a speed limit of 60 km/h and a minimum distance of 100 m applies to trucks. The right lane was also moved towards the middle of the bridge in a less damaged area. As new construction is a steel composite bridge with a two-part construction over a total of 29.5 m width for the two direction lanes planned. 755 M-long building should have a continuous beams with spans as building system in longitudinal direction of 59 m, 84 m, 103 m, 3 × 107 m, 105 m and 83 m. In the transverse direction, a construction that is rarely performed in Germany will be applied. Superstructure for each only a narrow steel girder height of 4.5 m is intended, to the double-sided cantilevered reinforced concrete road slab with diagonal Struts relies. Over the concrete steel round pillar is planned to combine the two in a distance of 14.9 m arranged racks by cross beams.

    A map is loading

    Timeline

    Loading timeline...

    Tags

    Loading tags ...

    Editing is available for members (midgr >= 6).

    News

    Lade Nachrichten ... loading news ...

    Links

    Loading links ...

    Literature

    Loading literature ...

    Collectibles

    Loading collectibles ...

    Videos

    Loading videos ...

    Documents

    Loading documents ...