BAS 3689
Railway bridge Raron

© Frank Sellke / brueckenweb.de

© Frank Sellke / brueckenweb.de

24.06.2011
© Frank Sellke / brueckenweb.de
Switzerland
Valais
Raron
directly to the new tunnel exit of the Lötschbergbasistunnels
Rhône
Railway (NEAT)
Girder bridge
Prestressed concrete
2001 bis ?
0.00 m
817.00 m
0.00 m
0.00 m
0.00 m
0.00 m2
in operation
North Bridge 554 m length and South Bridge 817 m length<br>The two bridges are ready and will be included in the year 2007 together with the Lötschbergbasistunnel in operation
A map is loading