brueckenweb-logo
discover
Icon
bridges
Icon
bridge search
Icon
nearby
Icon
most bridges records
Icon
disasters
Icon
country overview
Icon
collections
Icon
articles
Icon
bridge news
Icon
literature
Icon
store
Icon
Icon
pinboard
Icon
Icon
clubinfo
join in
only for registered club members
administrate
only for registered club members

    1999 - 2026 © Frank Sellke / brueckenweb.de

    Icons by Icons8.com

    Version 5.1.16

    Legal Notice | Privacy Policy | ⚠️ Vertrag widerrufen

    BAS 39659
    Railway bridge / oder
    EÜ Berlin - Warschau / Oder

    EÜ Berlin - Warschau / Oder

    27.3.08

    © Helmut Fischer

    Nachfrage / demandUse only on request
    EÜ Berlin - Warschau / Oder

    EÜ Berlin - Warschau / Oder

    27.3.08

    © Helmut Fischer

    Nachfrage / demandUse only on request
    EÜ Berlin - Warschau / Oder

    EÜ Berlin - Warschau / Oder

    27.3.08

    © Helmut Fischer

    Nachfrage / demandUse only on request
    To Bridge Images
    Germany / Poland
    Brandenburg - Lubuski
    Frankfurt / Oder - Slubice
    North of the A12
    Or - Odra
    Railway
    Arch, Arch under the roadway, provided truss bridges
    Steel
    2008
    104.00 m
    0.00 m
    0.00 m

    A map is loading

    Timeline

    Loading timeline...

    Tags

    Loading tags ...

    Editing is available for members (midgr >= 6).

    News

    Lade Nachrichten ... loading news ...

    Links

    Loading links ...

    Literature

    Loading literature ...

    Collectibles

    Loading collectibles ...

    Videos

    Loading videos ...

    Documents

    Loading documents ...

    0.00 m
    0.00 m
    0.00 m2
    destroyed
    Planned new building for 2008<br><br>old bridge:<bR><ul>
 <li>16 single-track timber carrier bridges in the foothills of the areas of each 40 m long</li>
 <li>A two-track truss bridge over the stream, 80 m long</li>
 <li>Overall length: 442 m</li>
 <li>Abutments and piers of 1870 (built 1946)</li>
 <li>Foreland bridge by 1900, 1925, 1951</li>
 <li>Power bridge 1951</li></ul><br><br>New bridge (2008):<br><ul><li>8 two-pronged prestressed concrete hollow box bridges in the foothills of the areas each 44 m long (end field in the West 30 m, final field in the East 40 m)</li>
 <li>A two-pronged network arch bridge over the stream, 104 m long</li>
 <li>Construction-related shift the entire bridge structure to 16 meters in the direction of the Polish Bank of the Oder river</li></ul><br><br>Construction process for the new bridge:<br><ul><li>Construction period: February to December 2008</li><li>February 24-25, 2008: Commissioning of the electronic signal box for the station bridge (controls the whole station with eight tracks, 23 points, as well as 47 signal and replaced two old signal boxes)</li><li>Easter 2008: Installation of help bridge on the Eastern abutment in the context of a total blocking (76 hours)</li><li>17 October until December 1, 2008: total revocation to the dismantling of the old bridge and installation of the new parts of the bridge. Redirection of 22 persons and 74 freight trains daily.</li></ul>My photos of the 27.3.08 still the State show the bridge at the beginning of the construction of the temporary bridge. The multiple images suggest with the submissions of Larsen and Krupp profiles of the readable time interval on the State of the subsoil.