BAS 40500
Railway bridge

28.01.2008
© Hans-Josef Kirsch
Keine weiteren Bilder verfügbar
Germany
Rhineland-Palatinate
Trier
District of Ehrang
Dirt track
Railway trier-Koblenz
Girder bridge
0.00 m
0.00 m
0.00 m
0.00 m
0.00 m
0.00 m2
in operation
Due to construction of the bridge BAS 42427 this bridge from the 28-30.11.08 was expanded and renovated. The two rests were renewed and increased by 28 cm, because the new Brücke(BAS42427)Wegen flood 28 cm higher than the old bridge (37600 built up.