brueckenweb-logo
discover
Icon
bridges
Icon
bridge search
Icon
nearby
Icon
most bridges records
Icon
disasters
Icon
country overview
Icon
collections
Icon
articles
Icon
bridge news
Icon
literature
Icon
store
Icon
Icon
pinboard
Icon
Icon
clubinfo
join in
only for registered club members
administrate
only for registered club members

    1999 - 2026 © Frank Sellke / brueckenweb.de

    Icons by Icons8.com

    Version 5.1.16

    Legal Notice | Privacy Policy | ⚠️ Vertrag widerrufen

    BAS 4134
    Death Castle bridge
    Brückenbild

    © Michael Rahnefeld, Geislingen

    verboten / prohibitedNo other use permitted
    Bild 1

    © Michael Rahnefeld, Geislingen

    verboten / prohibitedNo other use permitted
    Bild 2

    25.05.2014

    © www.brueckenweb.de / Frank Sellke

    gegen Entgeld / for a feeUse in accordance with the terms and conditions
    To Bridge Images
    Germany
    Baden-Württemberg
    Meadow rose
    Take the A8 motorway
    Arch, Arch under the roadway viaduct
    Steel-reinforced concrete
    1942
    18.00 m
    371.00 m
    0.00 m

    A map is loading

    Timeline

    Loading timeline...

    Tags

    Loading tags ...

    Editing is available for members (midgr >= 6).

    News

    Lade Nachrichten ... loading news ...

    Links

    Loading links ...

    Literature

    Loading literature ...

    Collectibles

    Loading collectibles ...

    Videos

    Loading videos ...

    Documents

    Loading documents ...

    0.00 m
    0.00 m
    0.00 m2
    in operation
    Arch and pillars 17 arch, 16 pillars<br>Pillar distance 18,45 m (c to c)<br>At the Ulm abutment's subsequent clamping beams concrete 43 m long<br>Height 25 m above ground (in axis)<br>Slope in the longitudinal axis of 4.91%<br>Radius of curves in the longitudinal axis of the building 250 m<br>Concrete and steel concrete mixtures including prestressed concrete beam structure and including the founding body built until 1942 45 000 m3<br>Built-in steel lot 1170 t<br>Work hours expended since 1955 (without insulation and pavement) 715-600 hrs.