BAS 42260
Harburg A253 Bridge

13.01.2017
© www.brueckenweb.de / Frank Sellke

13.01.2017
© www.brueckenweb.de / Frank Sellke

13.01.2017
© www.brueckenweb.de / Frank Sellke
Germany
Hamburg
Hamburg
Harburg district
Railway, roads, Mühlenbach
Autobahn A253, Bundesstrasse B75
Beam bridge, box girder bridge
prestressed concrete
1984
0.00 m
924.00 m
44.00 m
0.00 m
0.00 m
23977.00 m2
in operation
The bridge consists of 6 substructures (all hollow girders):
1. Length 190 m, width 16 m, area 3185 m², continuous girder over 6 spans
2. Length 190 m, width 16 m, area 3165 m², continuous girder over 6 spans
3. Length 153 m, width 10 m, area 1591 m², continuous girder over 5 spans and a hollow ramp
4. Length 454 m, width 22 m, area 10,132 m², continuous beam spanning 13 spans
5. Length 185 m, width 10 m, area 1,911 m², continuous beam spanning 5 spans and a hollow ramp
6. Length 90 m, width 44 m, area 3,993 m², continuous beam spanning 3 spans
BSU Amt V - Bund LSBG-B3 / Bezirk Harburg
747 (ASB: 2525037)
A map is loading