BAS 47376
Viaduct but
Keine weiteren Bilder verfügbar
Germany
North Rhine-Westphalia
Sondern
Bigge dam
Street L563
Girder bridge
Prestressed concrete
1960-1963
47.50 m
275.00 m
0.00 m
0.00 m
45.00 m
0.00 m2
Construction site
Between 2009 and 2011, the tensioning concrete superstructure and the Western abutment is completely demolished. Damage to the tendons requires this step. A steel composite superstructure is built as a replacement of the company Alpine.
A map is loading