BAS 4775
Toda Park bridge (T-bridge)
Keine weiteren Bilder verfügbar
Japan
Toda city
Pedestrian
Cable-stayed bridge
Steel
1989
134.00 m
179.00 m
7.85 m
0.00 m
0.00 m
0.00 m2
in operation
Pylon height 61.4 m<br>This bridge had severe vibration problems shortly after the opening, when they passed through the large crowd. Because it represents the connection to a motor boat Stadium, these strains occurred more frequently.