Prestressed concrete girders place concrete slab beam bridge
Prestressed concrete
2005 - 2006
35.00 m
52.50 m
17.60 m
A map is loading
Timeline
Loading timeline...
Tags
Loading tags ...
Editing is available for members (midgr >= 6).
News
Lade Nachrichten ... loading news ...
Links
Loading links ...
Literature
Loading literature ...
Collectibles
Loading collectibles ...
Videos
Loading videos ...
Documents
Loading documents ...
0.00 m
0.00 m
995.00 m2
in operation
The new Hauser Gate Bridge replaced the previous building from 1928 (BAS 5723).<br><br>The Hauser Gate Bridge is one of the most important
inner-city connections
the town of Wetzlar on the Lahn.<br>The new matured since 1928, there
existing steel bridge no longer
could be rehabilitated.<br>The spans of the bridge were
by a further support in the
Lahn shortened. The dimensions were
by an additional lane
widened.<br>The base was reinforced concrete construction,
the superstructure was with prestressed concrete
Bridge girders with the addition of a place concrete
manufactured.<br><br>Construction costs: EUR 4.4 million