located directly at the stables and the Nikolai district
Spree
Town Hall Street
Girder bridge
Steel
2011- 2012
0.00 m
41.00 m
18.00 m
A map is loading
Timeline
Loading timeline...
Tags
Loading tags ...
Editing is available for members (midgr >= 6).
News
Lade Nachrichten ... loading news ...
Links
Loading links ...
Literature
Loading literature ...
Collectibles
Loading collectibles ...
Videos
Loading videos ...
Documents
Loading documents ...
0.00 m
0.00 m
0.00 m2
Construction site
<br>Construction of the demolished BAS 2576.<br><br>The Berlin Senate in 1999 wrote a design competition for a new building of the bridge, which should serve as only a long field of bridges. The plans of the architect Walter A. Nahim, which envisages a modern reinforced concrete structure without River piers and side pedestal of monument, preference was given.<br><br>The Forum city image Berlin e.V. Association and other civil associations such as the society of historical Berlin (GHB) criticized the departure from the historical model and the continued presence of the abduction of the great elector before the Schloss Charlottenburg.<br><br>Despite the expressed criticism, construction began in the spring of 2009. The planned construction costs are at least six million Euro.Vorgesehener tray of this new bridge is the 13th / 14.8.2011 the images displayed here so far mainly for the new bridge to not applicable. You were arguably better to implement on the BAS 2576.