BAS 5192
Valley bridge top break
Keine weiteren Bilder verfügbar
Germany
Baden-Württemberg
Heidelsheim
Bruchbach
Rail (high-speed Stuttgart-Mannheim)
Girder bridge
Prestressed concrete
1984-1987
44.00 m
264.00 m
14.30 m
24.00 m
0.00 m
0.00 m2
in operation
The structure complies with the German Federal Railway's framework plan for valley bridges on new lines. It is designed as a single-span girder system with continuously welded track.[1]
The piers have a center distance of 44 m and were pile-founded in heavily weathered gypsum Keuper and quaternary cover layers.[1]
With a length of 262 m, the building's width is 14.30 m. The maximum clear height is 24.00 m.[1]
A map is loading