brueckenweb-logo
discover
Icon
bridges
Icon
bridge search
Icon
nearby
Icon
most bridges records
Icon
disasters
Icon
country overview
Icon
collections
Icon
articles
Icon
bridge news
Icon
literature
Icon
store
Icon
Icon
pinboard
Icon
Icon
clubinfo
join in
only for registered club members
administrate
only for registered club members

    1999 - 2026 © Frank Sellke / brueckenweb.de

    Icons by Icons8.com

    Version 5.1.16

    Legal Notice | Privacy Policy | ⚠️ Vertrag widerrufen

    BAS 56530
    Mosel bridge B419
    Brückenbild

    23.10.2013

    © Hans-Josef Kirsch

    gegen Entgeld / for a feeUse in accordance with the terms and conditions
    Brückenteil In Wellen

    Brückenteil In Wellen

    31.05.2013

    © Hans-Josef Kirsch

    gegen Entgeld / for a feeUse in accordance with the terms and conditions
    Montage der Brücke im Hafen von Mertert

    Montage der Brücke im Hafen von Mertert

    16.06.2013

    © Hans-Josef Kirsch

    gegen Entgeld / for a feeUse in accordance with the terms and conditions
    To Bridge Images
    Germany / Luxembourg
    Rhineland-Palatinate
    Wellen / Grevenmacher
    Mosel
    Street B419
    Arch, arch over the road surface, stave bow
    Steel
    2013-2014
    114.00 m
    215.00 m
    0.00 m
    0.00 m
    0.00 m
    0.00 m2
    Project

    The new Moselle bridge consists of 3 parts, 2 foreland elements and a large central element. The elements of foothills of the are assembled on the Luxembourg side above the existing bridge over the building by Bernard Massard - and on the German side below the bridge on the building yard of the highway maintenance depot, as well as the large middle section in the port of Mertert. If everything goes according to plan, the 3 parts will be exposed to the 24.08.2013 on the new bridge piers and must be welded then still together.<br>The total construction time of the Moselle bridge will take probably 4 half months. Following schedule is envisaged:<br><br>22.05.2013 to 15.10.2013 full lock of the bridge<br>22.05.2013 to 04.06.2013 lock B 419 under the bridge and traffic over the two bridges ramps towards Nittel<br>10.06.2013 of the demolition of the old bridge with some of the pillars to be completed.<br>05.08.2013 The majority of the bridges should be placed on the new pillar.<br>Shipping should not be impeded by the construction of the bridge essentially.<br><br>On the 08.08.2013 the bridge was on a pontoon from the port of Mertert after Grevenmacher pushed and into its final position.

    A map is loading

    Timeline

    Loading timeline...

    Tags

    Loading tags ...

    Editing is available for members (midgr >= 6).

    News

    Lade Nachrichten ... loading news ...

    Links

    Loading links ...

    Literature

    Loading literature ...

    Collectibles

    Loading collectibles ...

    Videos

    Loading videos ...

    Documents

    Loading documents ...