In November 2000 the company of HMB Mitteldeutsche construction began Halle AG the project with the laying of 6 km construction road. The first road was completed in the summer of 2002, the completion of the second of a total 523 m long bridge superstructure was in July 2003. The entire surface of the bridge is 15.428,5 square meters.<br><br>Type-tested, waterproof expansion joints in plate design are executed on both abutments. As a result of the stretching way calculations, 480 and WSG 640 (allowable movements to 390 and 520 mm) must be considered in this Übergangskonstuktionen of the type WSG bridge construction work.<br><br>external prestress box girder<br>Height of roadway above ground: 50 m<br>Concrete volume: 25 000 m³<br>