BAS 59911
Temporary cable bridge / U - line 5

Interimskabelbrücke / U - Bahnlinie 5
10.8.2011
© Helmut Fischer
Keine weiteren Bilder verfügbar
Germany
Berlin
Berlin Hellersdorf - Marzahn
OT Hamilton village, relating to bright Center and on the edge of the BAS 37721
U - line 5
to installed cable during the bridge renovation of BAS 37721
Girder bridge
Steel
2011
0.00 m
0.00 m
0.00 m
0.00 m
0.00 m
0.00 m2
Construction site
When the bridge was visited on October 30, 2018, it was no longer there and was therefore marked as destroyed.
Helmut Fischer
Helmut Fischer
A map is loading