Information provided by Dr. Tan:<br>Overall length: 137.60m (thus currently in Germany's longest bridge in this construction)<br>Field width: 28 m - 24.6 m-33 m - 32 m-20.90 m<br>Inclination: max 4.5%<br>Mantel height: 1.38 m<br>Fahrbahnbreite(gesamt)2x10.35m<br>Superelevation of the composite beam: 0.31 m<br>Max.Length/weight of in the superstructure of the Träger:32.88m/42.0 to<br>The two buildings were carried out as 5-fürstenmoor continuous double composite construction with 4 preloaded<br>40 SAM clamping composite carriers<br>The working principle for Prestressed SAM clamping bonded carrier is to refer to the "General technical approval" Z-26.2-40 or to demand directly from the manufacturer SAM GmbH Zwickau.<br>