Information by Peter Arnold:<br>Construction of the Mannheim Plochinger AG<br>To the better clearance of the fairway of the Neckar River, a channel with Weir and pedestrian crossing was built in 1925. The Neckar in the Neckar Canal and the old Neckar splits at Heidelberg-Wieblingen. This
used at high tide.