brueckenweb-logo
discover
Icon
bridges
Icon
bridge search
Icon
nearby
Icon
most bridges records
Icon
disasters
Icon
country overview
Icon
collections
Icon
articles
Icon
bridge news
Icon
literature
Icon
store
Icon
Icon
pinboard
Icon
Icon
clubinfo
join in
only for registered club members
administrate
only for registered club members

    1999 - 2026 © Frank Sellke / brueckenweb.de

    Icons by Icons8.com

    Version 5.1.16

    Legal Notice | Privacy Policy | ⚠️ Vertrag widerrufen

    BAS 66397
    Viaduct North environment Rottweil
    Brückenbild

    20.08.2016

    © www.brueckenweb.de / Frank Sellke

    gegen Entgeld / for a feeUse in accordance with the terms and conditions
    Bild 1

    20.08.2016

    © www.brueckenweb.de / Frank Sellke

    gegen Entgeld / for a feeUse in accordance with the terms and conditions
    Bild 2

    20.08.2016

    © www.brueckenweb.de / Frank Sellke

    gegen Entgeld / for a feeUse in accordance with the terms and conditions
    To Bridge Images
    Germany
    Baden-Württemberg
    Rottweil
    Neckar
    Road B27
    Girder bridge
    Prestressed concrete
    1999-2002
    72.00 m
    295.00 m
    0.00 m
    58.00 m
    0.00 m
    0.00 m2
    in operation
    Wikipedia:<br>The viaduct of the Northern bypass of Rottweil is a 2002 finished crossing of the Bundesstraße 27 over the Neckar about one kilometer North of Rottweil with a total length of 295 metres. It consists of five fields with the width of 45 m, 50 m, 58 m, 72 m and 70 m. End of July 1999 was begun with the construction of the bridge over the Neckar Valley, the bridge should be originally completed in August 2001. Spanning the Neckar Valley, four pillars are required. The construction of the bridge cost 11 million DM.
 
 The built was used for the construction of the bridge body, were retracted by the Western bridgehead of individual prefabricated hollow. Each 30 meters of the roadway were concreted in the built. The stem Bill itself had a length of 42 meters and weighed 160 tons. The prestressing steel is not within the concrete of the bridge, but in the cavity of the body of the bridge.
 
 On November 30, 2001, a large temporary help pillar of the new bridge was blown up. 15: 00 Exploded four kilograms of nitroglycerine and brought the 300-ton concrete pillar to overturn. The pillar of aid was needed in the construction of the bridge, to overcome the span between the actual pillars (72 meters).<br><br>Rottweils new Northern bypass was officially opened on Friday, 18 October 2002. The height above ground is 58 m.

    A map is loading

    Timeline

    Loading timeline...

    Tags

    Loading tags ...

    Editing is available for members (midgr >= 6).

    News

    Lade Nachrichten ... loading news ...

    Links

    Loading links ...

    Literature

    Loading literature ...

    Collectibles

    Loading collectibles ...

    Videos

    Loading videos ...

    Documents

    Loading documents ...