BAS 67691
SBS B236

30.05.2020
© www.brueckenweb.de / Frank Sellke

30.05.2020
© www.brueckenweb.de / Frank Sellke

30.05.2020
© www.brueckenweb.de / Frank Sellke
Germany
North Rhine-Westphalia
Finnentrop
Railway (Ruhr Siegbahn)
Street B236
Girder bridge
Composite steel
2012-2013
0.00 m
0.00 m
0.00 m
0.00 m
0.00 m
0.00 m2
Construction site
From the 21.06.2013 to the 24.06.2013, the steel beams and precast concrete elements of the bridge were built in a 72-hour operation break of the car.
A map is loading