
EÜ Strecke Berlin - Frankfurt Oder - Warschau / Treskowallee
28.6.2013
© Helmut Fischer

EÜ Strecke Berlin - Frankfurt Oder - Warschau / Treskowallee
5.10.2013
© Helmut Fischer

EÜ Strecke Berlin - Frankfurt Oder - Warschau / Treskowallee
3.10.2013
© Helmut Fischer
The area already commissioned for the remote and regional railway is need to started, still built during more buildings on two edges, and especially for the S - Bahn operation. This bridge replaced the BAS 37844. While I had hired 2 pictures of the 11.10.2013 in the belief that all buildings were built, the message appeared in the Berlin news that there had been a bridge collapse at the 2 workers severely and 1 worker was slightly injured. On the morning of the 12.10.2013 was announced, the 1 worker died of the consequences of the accident. The bridge complex was viewed after a morning visit from me. 1 inner box was obviously but still not built, but during a visit the day before not to recognize. These are egg en field installation which should complement the eingeglaste and roofed pedestrian above buildings and with a field in East direction to the existing station. This area was obstructed with many frameworks and almost not visible from outside.Therefore it was therefore my false statement, that the Assembly work of the whole bridge the day before completed have been. All at the punitive blocking you somehow could see a bridge crash I've photographed and do here with new images to it. The operation of the entire node is set, is not shown here but as exceptional situation. Helmut Fischer. After the construction of the new bridge the old passage is how to ensure once again. The conversion of implementing road with strabismus should take over the years. The passage is hereby documented with images of the 20.10.2013. Helmut Fischer
A map is loading