BAS 71920
Hartenstein Mulde Bridge

Hartensteiner Muldenbrücke
17.06.2014
© Günter Hoppe

Hartensteiner Muldenbrücke
17.06.2014
© Günter Hoppe
Germany
Saxony
Hartenstein
Zwickauer Mulde
Federal highway
Beam bridge
reinforced concrete
2013/ 2014
0.00 m
0.00 m
0.00 m
0.00 m
0.00 m
0.00 m2
in operation
Replacement structure for the existing steel bridge next door. Construction was delayed by the 2013 floods.
The handover will take place in June 2014.
A map is loading