brueckenweb-logo
discover
Icon
bridges
Icon
bridge search
Icon
nearby
Icon
most bridges records
Icon
disasters
Icon
country overview
Icon
collections
Icon
articles
Icon
bridge news
Icon
literature
Icon
store
Icon
Icon
pinboard
Icon
Icon
clubinfo
join in
only for registered club members
administrate
only for registered club members

    1999 - 2026 © Frank Sellke / brueckenweb.de

    Icons by Icons8.com

    Version 5.1.16

    Legal Notice | Privacy Policy | ⚠️ Vertrag widerrufen

    BAS 7221
    Werra bridge
    Brückenbild

    © Heidi Zengerling

    Use of Heidi Zengerling
    Bild 1

    © Heidi Zengerling

    Use of Heidi Zengerling
    Bild 2

    © Heidi Zengerling

    Use of Heidi Zengerling
    To Bridge Images
    Germany
    Thuringia, Germany
    Mihla
    Werra
    Street
    Girder bridge
    Prestressed concrete
    1996
    40.50 m
    0.00 m
    0.00 m
    0.00 m
    0.00 m
    0.00 m2
    in operation
    Information by Heidi Zahir:<br>Since 1935, a fünffeldriges bridge construction with steel concrete superstructure on the Werra in the direction of Creuzburg led on the outskirts Mihla. The bridge was damaged in the second world war, until 1954 was renewed the cantilever of the midfield and the lying on this slope applicator in the field 2. Checking bridges main 1994 proved to be the poor condition of the building of the bridge condition grade 4, also the capacity with only 16 tons ceased the traffic requirements in one pure traffic. Therefore, a spare new building of the bridge in the course of the L was 1017 dringed required. A bridge construction should occur, which balanced design is, blends harmoniously into the landscape and provides a sufficient flow height for the 100-year old flood (including 50 cm freeboard). Five different variants were examined to in relation to the planning of the new building. A special design, which included a vacuum-sealed prestressed concrete structure instead of the manufactured superstructure with a steel composite cross-section in otherwise complete compliance with the external appearance was given preference. With the start of construction on the 03.06.1996 a dreifeldriges building was until his graduation on the 16.07.1997, that 40.50 - 30,35 m visually balanced presents itself with its selected spans of 30,35 -. In spite of difficult conditions – at the bridgeheads, the plot was heavily restricted by a previous Avenue and extensive tree protection required - could be released the bridge on the 20.12.1996 for traffic.

    A map is loading

    Timeline

    Loading timeline...

    Tags

    Loading tags ...

    Editing is available for members (midgr >= 6).

    News

    Lade Nachrichten ... loading news ...

    Links

    Loading links ...

    Literature

    Loading literature ...

    Collectibles

    Loading collectibles ...

    Videos

    Loading videos ...

    Documents

    Loading documents ...