
Alternative Freybrücke / Havel
4.8.2014
© Helmut Fischer

Alternative Freybrücke / Havel
4.8.2014
© Helmut Fischer

Interims - Freybrücke / Havel
18.10.2015
© Helmut Fischer
These two overpasses will each carry traffic in both directions. They are in the same row as the old bridge north of BAS 13070.
Traffic is in full swing on both overpasses, and the old free-standing bridge BAS 13070 has since been demolished. Construction of the new bridge at the old location has begun. The new free-standing bridge is intended to resemble the old one, and construction is underway. Today, BAS 79143 will be re-entered.
Berlin, October 19, 2015 Helmut Fischer Visit to the bridge on May 19, 2019: The temporary bridge is no longer there. Helmut Fischer
A map is loading