The bridge will be lifted into place in the next few days and is similar to the recently constructed BAS 76066. The road is currently closed for a considerable distance, and a small sheet pile wall has been driven into the ground at the designated bearings, as shown in the first images.
The bridge was found completed on April 6, 2015. The previously driven sheet pile profiles were used as supports, and since the bridge was welded to the sheet piles, the principle of constructing a bridge as a girder on two supports, which always has one fixed and one movable bearing, is not present as originally intended. I am therefore converting the bridge into a frame structure. Helmut Fischer Helmut Fischer