BAS 85099
Junction

08.04.2017
© www.brueckenweb.de / Frank Sellke

08.04.2017
© www.brueckenweb.de / Frank Sellke

08.04.2017
© www.brueckenweb.de / Frank Sellke
Germany
North Rhine-Westphalia
Dortmund
Railway
Railway
Truss bridge
Steel
1909
46.00 m
46.00 m
13.00 m
0.00 m
0.00 m
676.00 m2
in operation
Steel bridge, parallel truss structure, lower roadway (over DBAG tracks)
Gravity abutment walls made of natural stone masonry and reinforced concrete
Bearing girders, bearing bases and chamber walls
span between 42 m and 46 m, total width of the two superstructures: 13 m
Between April 15, 2024 and June 30, 2024, the bridge superstructure is to be demolished and replaced by an embankment. The abutments will remain in the embankment.
DB Netz AG
A map is loading