BAS 9017
Meißner lane bridge

15.06.2006
© Heidi Zengerling
Use of Heidi Zengerling

15.06.2006
© Heidi Zengerling
Use of Heidi Zengerling

15.06.2006
© Heidi Zengerling
Use of Heidi Zengerling
Germany
Thuringia, Germany
Mühlhausen
Schwemmnotte, Popperöder Bach
Street
Girder bridge
Concrete
2006
0.00 m
0.00 m
0.00 m
0.00 m
0.00 m
0.00 m2
in operation
Opening:<br>In the street, Meißner, the new bridge over the Schwemmnotte to use has been handed on June 14, 2006. the reinforced concrete construction has cost the city 50 €000.<br>Since the 1920s/1930s, Mayor Peter Bühner said on June 14 that "nothing has been made" on the bridge. A static test have shown but that the stability is no longer guaranteed. The old travertine slabs were broken and steel plates had to intercept the loads in their place. In addition, the bridge had been damaged by the laying of supply lines. Therefore, the municipal administration has undergone the structure of a makeover. It cost approximately €50 000 from the city coffers.<br>The new load-bearing 30 tonnes consists of a concrete frame. Professionally, the supply lines under the bridge were laid. In addition construction Office Director Volkmar Schelzke said a pipe, 10 cm in diameter, was installed was the event that later become a space for more lines.<br>The bridge railing protruding from travertine slabs, the skilled person called Cap stones.<br>The planning and construction management had taken over the company construction project Mühlhausen, and performed the Mühlhäuser universal construction company has work in the period from March 20 to June 14.
A map is loading