Wingspan: 3 fields with approx. 51 m (12 m + 30 m + 9 m)<br>Construction: 1 wall / 1-stöckig (sometimes more)<br>System: Krupp Delta bridge (System D)<br>Load: 30 to<br>Location: Lörrach - Weil am Rhein (Baden-Württemberg)<br>Subsoil: site access site B317 Lörrach because duty-free road (D-CH) =.<br>Year of construction: 2006<br>built by the THW garbage home<br><br><br>Information by September 12, 2010:<br>the temporary bridge in Lörrach with the archive number BAS 9051 is now restored and was about 1.5 miles downstream in Riehen (Switzerland) rebuilt in a slightly modified design.