The bridge is demolished and replaced by a new building.<br><br>The Berliner Zeitung sums up the current state of the reconstruction planning as follows:<br>Not only S-Bahn passengers, but also car drivers will start to feel the reconstruction of railway station Ostkreuz. An important North-South connection must be closed in a year. As of April 2007 the bridge in the course of the Kynaststraße will be demolished and rebuilt. "It is irreparably desolate. The beams are rusted", Eva Marie Zimmer said during a meeting on the reconstruction of the East cross by the Senate Department for urban development. The new bridge should be released in 2008 for vehicle traffic. She will be with 172 meters 100 meters longer than its predecessor, but have same width: 20 meters. During the reconstruction, motorists have to Dodge to the West. Redirect crosses the Modersohn bridge.