<br>Field width: 19.50 – 22.50 meters - 18.10 m - 17.75 m<br>Mantel height: 1.00 m<br>Mantel width: 4.00-5.40 m<br>Construction cost: 7.100.000 DM<br><br>In the wake of the new buildings of the Eisenbahnüberführungen about the dam of Saxony and the BAB 100, also a parallel pedestrian bridge was built. It consists of two continuous steel concrete above buildings.<br><br>In the mid range between Sachsendamm and BAB 100, the Western Front superstructure, a combined and disabled crafted stair and ramp system was created. Complementary components such as planting troughs, railing, lighting, etc. complete the architectural picture of the system.