brueckenweb-logo
discover
Icon
bridges
Icon
bridge search
Icon
nearby
Icon
most bridges records
Icon
disasters
Icon
country overview
Icon
collections
Icon
articles
Icon
bridge news
Icon
literature
Icon
store
Icon
Icon
pinboard
Icon
Icon
clubinfo
join in
only for registered club members
administrate
only for registered club members

    1999 - 2026 © Frank Sellke / brueckenweb.de

    Icons by Icons8.com

    Version 5.1.16

    Legal Notice | Privacy Policy | ⚠️ Vertrag widerrufen

    BAS 92957
    EÜ long-distance railway tracks Berlin - Frankfurt Oder etc. / Access and through to Karlshorst station southeast end
    Brückenbild

    24.05.2019

    © Helmut Fischer

    Nachfrage / demandUse only on request
    Bild 1

    © Helmut Fischer

    Nachfrage / demandUse only on request
    EÜ Fernbahngleise Berlin - Frankfurt Oder etc / Zu und Durchgang Bf. Karlshorst Ostende, im Bildhintergrund

    EÜ Fernbahngleise Berlin - Frankfurt Oder etc / Zu und Durchgang Bf. Karlshorst Ostende, im Bildhintergrund

    22.6.2019

    © Helmut Fischer

    Nachfrage / demandUse only on request
    To Bridge Images
    Germany
    Berlin
    Berlin Lichtenberg
    in the Karlshorst district, at the southeast end of Karlshorst train station
    Passage and S-Bahn station access
    EÜ route long-distance railway tracks Berlin - Frankfurt Oder - Warsaw etc.
    Beam bridge, 1 span
    Steel
    2018
    0.00 m
    0.00 m
    0.00 m

    A map is loading

    Timeline

    Loading timeline...

    Tags

    Loading tags ...

    Editing is available for members (midgr >= 6).

    News

    Lade Nachrichten ... loading news ...

    Links

    Loading links ...

    Literature

    Loading literature ...

    Collectibles

    Loading collectibles ...

    Videos

    Loading videos ...

    Documents

    Loading documents ...

    0.00 m
    0.00 m
    0.00 m2
    in operation
    The bridge for long-distance traffic is already in operation, and the remaining sections of the BAS 37843 railway line also remain open. Access under the long-distance and local traffic lines still needs to be adapted and completed. Access under the bridge is currently closed due to the ongoing construction work. Helmut Fischer, August 12, 2018