brueckenweb-logo
discover
Icon
bridges
Icon
bridge search
Icon
nearby
Icon
most bridges records
Icon
disasters
Icon
country overview
Icon
collections
Icon
articles
Icon
bridge news
Icon
literature
Icon
store
Icon
Icon
pinboard
Icon
Icon
clubinfo
join in
only for registered club members
administrate
only for registered club members

    1999 - 2026 © Frank Sellke / brueckenweb.de

    Icons by Icons8.com

    Version 5.1.16

    Legal Notice | Privacy Policy | ⚠️ Vertrag widerrufen

    BAS 98448
    Hammerweg Bridge
    Brückenbild

    13.12.2020

    © www.brueckenweb.de / Frank Sellke

    gegen Entgeld / for a feeUse in accordance with the terms and conditions
    Bild 1

    13.12.2020

    © www.brueckenweb.de / Frank Sellke

    gegen Entgeld / for a feeUse in accordance with the terms and conditions
    Bild 2

    13.12.2020

    © www.brueckenweb.de / Frank Sellke

    gegen Entgeld / for a feeUse in accordance with the terms and conditions
    To Bridge Images
    Germany
    North Rhine-Westphalia
    Leverkusen
    Dhünn
    Street
    Beam bridge, vaulted bridge
    concrete
    1927/1928
    0.00 m
    0.00 m
    0.00 m
    0.00 m
    0.00 m
    0.00 m2
    in operation
    City Council Proposal 2021/0395: The bridge structure W 004 Hammerweg, located in the Schlebusch district, serves as access and development for the Freudenthaler Sensenhammer residential and commercial area. The bridge spans the Dhünn River at an oblique angle (50 degrees). It lies within the Dhünn Flora and Fauna Habitat (FFH protected area). A landscape conservation area and a nature reserve are directly adjacent (Annex 1). The bridge was constructed of reinforced concrete in 1927/1928. Its calculated service life of 80 years has been exceeded by 12 years.
    In 2016, an engineering firm conducted a structural recalculation of the bridge based on a main inspection and the damage identified during that inspection, in order to verify its load-bearing capacity. The investigation led to the following findings:
    In 1969, due to existing damage (corrosion on the reinforcement and concrete damage), the concrete cover for the reinforcing steel was increased. Since then, the progression of the damage can no longer be adequately monitored due to the increased concrete cover. The recalculation concluded that a load of 30 tons on the bridge can still be permitted. However, it was strongly recommended that a new building be planned by 2021, as further progression of the damage could lead to restrictions on the structure's use (such as a reduction in the permissible load). A complete closure would then also be a possibility.
    The planning for the new building is to be completed in 2021 so that construction can begin in 2022.
    Stadt Leverkusen
    W 004

    A map is loading

    Timeline

    Loading timeline...

    Tags

    Loading tags ...

    Editing is available for members (midgr >= 6).

    News

    Lade Nachrichten ... loading news ...

    Links

    Loading links ...

    Literature

    Loading literature ...

    Collectibles

    Loading collectibles ...

    Videos

    Loading videos ...

    Documents

    Loading documents ...